Latest News

  • Home
  • Tender
  • Construction and Installation of 3.3 MWp Solar Power Plant with 2MWh Battery Energy Storage System (BESS) at Sost, Upper Hunza, Gilgit Baltistan, Pakistan RFP Reference No.: NPAK/008/2026/W/O-SPP/RFB

Construction and Installation of 3.3 MWp Solar Power Plant with 2MWh Battery Energy Storage System (BESS) at Sost, Upper Hunza, Gilgit Baltistan, Pakistan RFP Reference No.: NPAK/008/2026/W/O-SPP/RFB

Leave a Comment

Cart

No products in the cart.

Create your account